Thanks for your reports! This patch cleans up thoroughly when you demolish or move things and makes sure traffic no longer gets stuck.
🚗 No more endless traffic jams after demolition Demolishing a road while vehicles were driving on it could bring all traffic to a halt: the vehicles stopped, everyone behind them waited, and nobody reached the airport anymore.
↩️ If the road disappears under a vehicle, it turns around or disappears instead of driving across the grass or standing still.
⏱️ A car, bus or city truck that is stuck for an unusually long time now clears itself, so the queue behind it can move on. Intended stops at the terminal, at the bus stop or while parking don’t count.
🅿️ If you move a parking garage, cars drive to its new entrance.
🚇 Cars only enter tunnels that still exist and leave them one after another instead of all on the same spot.
💾 Saves in which traffic is already stuck clear themselves when you load them.
🧹 No more invisible leftovers Some buildings left invisible tiles behind after being demolished or moved, where you could no longer build anything:
🛃 A rotated customs office.
🚇 A rotated tunnel portal – the old access road no longer stays behind.
📦 The cargo terminal – its access road now moves along with it.
🏢 Terminals 1 to 4 – their entrance roads are removed together with them. Here too, old saves are cleaned up automatically when you load them. 🚇 Clear message for tunnels that are too long A tunnel can be at most 50 tiles long. Until now, the preview still showed green and you got a confusing message. Now the tile that is too far turns red, and you get the message “A tunnel may be at most 50 tiles long.” Have fun rebuilding!
