The Bus Station
In addition to the regular bus stop, there is now a larger option: the Bus Station for $120,000.
It occupies 4×4 tiles, comes with its own bus yard, and has two bus bays. Twice as many buses can stop here compared to a normal bus stop, which also means more passengers can arrive at your airport.

Freight rolls into the city
Until now the freight simply vanished once a truck had picked it up from the plane. From now on it goes where it belongs: into your cargo terminal's warehouse – and it has to get back out again, too.
📦 The cargo warehouse
Every cargo plane you handle adds to the warehouse. The cargo terminal window shows the level as a bar that runs from green through yellow to red.
\[]Once the warehouse is full, the freight just sits there – you need trucks to collect it \[]The bar shows level and capacity, including the number of annexes
The line below tells you at a glance how many trucks are on the road, at a ramp or in the city
🚚 Internal and 🚛 external trucks
The cargo trucks you know are now called internal trucks – they drive to the aircraft and bring the freight into the warehouse. The new external trucks take it away again.
\[]External truck: $15,000 at the cargo terminal, selling one returns $7,500 \[]It shuttles between city and terminal on its own – every run into the city pays $2,500 \[]In the yard it turns around and backs up to one of the four ramps, just like the real thing \[]Ramps are handed out in order; when all four are taken, the next truck waits on the street \[]If there is not enough in the warehouse, it stays at the ramp until enough freight has arrived \[]Its own 3D model with a distance version, so even a large fleet stays smooth
👷 External truck drivers
Without staff no semi leaves the yard. The cargo terminal now hires two kinds of personnel.
\[]External truck drivers cost $45 a day, separately for the day and the night shift \[]Only as many trucks run as you have drivers on duty – the rest stay in the city \[]Hire nobody for the night and the traffic rests until morning \[]Lay staff off and the trucks turn around on the street; those already at a ramp finish their run
🔬 New in the research tree
The cargo branch has grown – both kinds of truck can be upgraded separately.
\[]Internal Trucks Level 2 and 3 (the former cargo branch, now clearly named) \[]External Trucks Level 2 and 3 as a branch of their own
Without research you may run 5 trucks of each kind, Level 2 raises it to 12, Level 3 to 25
🏗️ Cargo terminal extension
When the warehouse gets tight, you build on – just like the passenger terminal, tile by tile.
\[]Research it first ($250,000), after that the extension is waiting in the build menu \[]Each tile costs $50,000 and raises warehouse capacity by 10 % – add as many as you like \[]Façade and roof match the cargo terminal, only without ramps \[]Build it right next to the terminal or onto an existing tile
✨ Also in this update
Only one cargo terminal per airport can be built.