MEGACITY Development Update
Development has focused on connecting more of the city’s systems: Government instructions to paid work, weapons to finite ammunition, damaged facilities to reduced services, and completed actions to persistent records.
Government Headquarters and Council Management
The existing **Civic Admin Complex** is now explicitly designated as the government’s physical headquarters. It houses the command office, Deputy, Council chamber and central administration. Military, intelligence, law-enforcement and utility facilities retain their separate responsibilities.
Council management now provides:
- Councilor portfolio summaries showing departmental problems, recent work and blockers.
- Supported maintenance instructions with a defined budget and real repair requirements.
- Clearer distinctions between holding office and being available for duties.
- Eligible acting cover for supported temporary absences.
- More informative succession records.
- Shared-resource requests that expose competing departmental needs.
- More consistent seat, appointment and availability information.
These instructions use existing personnel, resources and order mechanisms. A Council priority does not create free work.
Institutional Intelligence Networks
Agents can now develop more specific institutional access instead of functioning only as a source of general intelligence points.
Supported activities include:
- Choosing a network-building focus.
- Attempting timed cover postings within suitable institutions.
- Developing contacts through recorded people and organizations.
- Asking specific intelligence questions.
- Rechecking access when employment, appointments or institutional conditions change.
An administrative posting does not grant command authority. Contacts are not additional deployable agents, and successful access does not guarantee that useful evidence exists.
Reports retain their recorded sources and historical names. **Insufficient access, uncertain causes and unknown information remain valid results.**
NPC Governance, Politics and Diplomacy
Megacity and township dossiers now include monthly governance reviews and clearer commitment information.
A limited public-works response path connects supported NPC actions to recorded partner-owned capacity. Repairs and other physical responses require resources rather than appearing simply because a government selected a priority.
Relationship and commitment summaries also make actual deliveries, delays and shortfalls easier to distinguish.
Within the city, occasional small Democratic and Conservative gatherings add background political activity. Some conclude quietly; recorded incidents can produce consequences and reporting. These parties remain remnants of old politics—not major political threats to the regime.
Military Forces, Retinue Operations and Combat Records
Military work has improved the accounting behind companies, reserves, garrison medical care and force availability. Organization and rotation information is clearer, particularly as rosters expand.
Combat reporting has also gained more detail:
- Recorded weapon effects and target information.
- Relevant combat conditions.
- Recovery information.
- Better retention and reopening of historical reports.
- Clearer separation of personnel casualties from effects such as smoke, EMP and structural damage.
Supported retinue operations now use persistent local hostile cohorts with separately recorded wounds, fatalities and operational readiness.
Physical ammunition production and issue paths have been added for supported retinue weapons. These use compatible, finite stocks rather than silently treating old generic ammunition records as a particular caliber.
Supported retinue orders can also connect to selected observed world-map contacts.
This remains an expanding system: not every weapon or combat mode records the same level of detail.
Aircraft, Heavy Hover Transports and Model Designations
Air-mission preparation now better supports small, medium and large forces assembled from multiple squadrons.
Missile missions reserve compatible physical missiles, while aircraft ownership is more clearly accounted for between home inventories, loaded missions and other postings.
New heavy hover transports include:
- **HTC-240 — Hover Troop Carrier**
- **HFC-1600 — Hover Freight Carrier**
- **HPC-320 — Hover Passenger Carrier**
These require research, manufactured components, qualified staff, suitable facilities and operating supplies.
The **HJG-01 hover-jet gunship** combines hover capability with jet-powered forward travel.
Machine model designations have also been standardized across vehicles, aircraft, robots, drones and related equipment. Internal identities, player-assigned names and names recorded in historical reports are preserved.
Siege Supplies and Operations
Siege information now includes supply-endurance estimates where the simulation has a defensible consumption rate.
Blockade summaries identify actual held cargo rather than assuming that contracted goods arrived.
Additional operational information covers wall readiness, supported relief and reinforcement previews, and surrender-intake checks.
Ending a blockade does not automatically deliver its cargo. Ownership, transport and physical arrival remain separate parts of the simulation.
Organ Replacement, Medical Products and Research
Organ-specific stock and treatment handling now distinguishes:
- **Donor**
- **Cloned**
- **Bionic**
- **Cybernetic**
Supported player and companion treatments use actual products and medical requirements. Product comparisons distinguish ordinary restoration from recorded enhancements, while selected research projects consume finite organ supplies.
Supported installed devices also have an accountable maintenance path.
Science-project registers provide more information about readiness, requirements and recorded outcomes. Recovered archives can contribute to eligible research, but cannot bypass technology prerequisites.
Municipal Robots and Their Equipment
Supported municipal robots now have clearer model-readiness, equipment and repair records.
Compatible physical tools and upgrades can be installed using actual stock and costs. Repairs depend on the relevant facilities, and human fallback is checked against genuinely available staff.
Reliability summaries distinguish completed repairs from cancellations. Saved completion records also prevent later turns from repeating the same repair costs or benefits.
## Production, Inspection and Recalls
The new product-withdrawal system can hold actual available municipal stock for precautionary review.
Selected manufacturing paths now support inspection evidence, keeping two different situations separate:
- **A precautionary hold**, where a defect has not been established.
- **A confirmed defect**, supported by a recorded inspection result.
Held goods continue to occupy storage. Releasing or disposing of them cannot duplicate inventory, and recalls cannot recover goods already consumed or sold.
Production and stockpile information has also been expanded to explain more shared-resource constraints and research-to-production connections.
Discoverable **geothermal resource sites** have been added and connected to eligible power generation.
Districts, Housing and Infrastructure
A fully developed hab district can now potentially support **up to 10 million residents**. That is a housing-capacity ceiling—not automatic population, measured occupancy or a limit applied to every district type.
District trend and repair-history panels provide more local information. Repair orders retain their original asset and district snapshots even if the target is subsequently removed.
Worksite-access restrictions apply where a verified shared limit exists.
Robotics facilities are also more firmly connected to physical infrastructure: recorded destruction can block construction and pause paid repairs, while restoration can allow work to resume.
Hab-block lifts have received a first operational service layer. Individual elevator faults and passenger trips are not yet simulated.
Sanitation, Recycling and Damaged Waste Facilities
Sanitation now provides clearer summaries of:
- Requested and allocated workers, vehicles and service participants.
- Manager priorities.
- Actual operating costs and fuel use.
- Storm-related sand backlogs.
- Community-service cohorts.
- Compatible waste storage.
- Recycling receipts and four-tick returns.
Current allocation previews are kept separate from work already performed. Changing a manager setting does not erase the recorded cost of earlier operations.
Waste-facility condition now affects **actual processing throughput and usable storage capacity**.
If damage reduces capacity below the quantity already stored, that waste remains held. It is not deleted or counted again as newly generated waste. Unrecorded facility condition also remains explicitly unverified after loading.
Charts, Guidance and Persistent Records
Recorded-history charts now make more production, food, utility, workforce, trade and infrastructure activity easier to review without relying entirely on text.
Navigation and guidance improvements include:
- Shortcuts to relevant management panels behind supported blockers.
- Clearer command availability and refusal information.
- Department-based tutorial browsing.
- Resuming individual lessons.
- Updated tutorial and manual explanations of newer systems and production connections.
Additional fixes protect earlier city records from later turns, preserve historical names and sources, and prevent supported processing paths from repeating costs or rewards after loading.
