Update 0.3 — The Moonshot Update
Hi everyone,
Update 0.3, the Moonshot Update, is ready! This update takes Launch Window beyond Earth orbit for the first time.
The update adds complete lunar missions, shared launches, a new contract proposal system, and a rebuilt mission-planning flow. It also includes major changes to campaign screens, flight profiles, and the way planning choices are presented. Here's a look at what's new.
Lunar Missions
The biggest addition is a new group of lunar missions. Companies can now take on four types:
- Lunar impact missions
- Lunar orbit missions
- Robotic lunar landings
- Crewed lunar landings with a safe return to Earth
Lunar flights begin in Earth parking orbit before translunar injection. Depending on the objective, a mission may continue through lunar-orbit insertion, descent, landing, surface operations, ascent, rendezvous, trans-Earth injection, reentry, and recovery.
Transfer and descent choices affect flight time, cost, reserves, and risk. Crewed expeditions can also use a free-return trajectory as a contingency.
Contract Proposals
Contracts are no longer accepted with a single click. You now submit a proposal to the client.
- Choose an available vehicle, reserve one already in production, or order new hardware if the proposal wins.
- Set a promised launch date and decide how much schedule margin to keep.
- Set your price and compare the proposal with rival companies.
- Revise rejected proposals while submissions remain open.
- See whether the client places more weight on price, schedule, or mission assurance.
An aggressive price or early date can improve a proposal, but it can also leave the company responsible for a difficult and expensive commitment.
Shared Launches
Compatible contracts can now fly together on one rocket. After selecting the primary payload, the planner shows accepted contracts that share a workable destination, schedule, recovery plan, crew requirement, orbit, and lunar arrival profile.
A new payload-bay display shows the vehicle's available capacity and the space used by each payload before the manifest is filed.
Mission Planning
I've also replaced the previous planning screens with one mission-specific flow. Depending on the flight, planning can now include:
- Vehicle and payload selection
- Ascent and aerodynamic-load strategy
- Recovery heading or corridor
- Orbital insertion and circularization
- High-orbit or geostationary transfer
- Translunar transfer and lunar descent
- Checkout and rehearsal programs
- Insurance and final launch authorization
The planner only shows decisions that apply to the selected mission and vehicle. Invalid combinations are blocked with an explanation. Changes to a plan update the trajectory, schedule, budget, and risk together.
Trajectory alternatives are calculated in the background so previews remain responsive while moving between choices.
Mission Profiles and Flight View
Orbital missions now establish stable orbits instead of following extended ballistic paths. Circularization, parking orbits, apogee coasts, kick stages, high-orbit insertion, retrofire, and recovery appear when required by the mission.
The flight view now includes a rendered Moon at its relative scale and position, along with the Sun, a star field, atmospheric scattering, Earthshine, and adaptive exposure. Lunar arrival, orbit, and landing use Moon-relative camera views.
Suborbital reentry, staging transitions, recovery targeting, water landings, camera controls, and flight-path readability have also been revised.
Interface and Campaign Changes
The Mission Board, contract proposals, launch planner, vehicle catalog, order review, company programs, campaign progress, and mission results have been revised around a more consistent mission-control interface.
The promised date from a winning proposal now follows the mission into launch planning. Late launches remain possible, but the client reduces its payment according to the delay. The planner shows that penalty before the launch is authorized.
Vehicle assignment now consistently reserves the earliest available matching vehicle, and a ready mission opens directly into the launch scene.
Other Changes and Fixes
- Fixed ready launches that could not be opened or started.
- Restored Spacebar launch input alongside the on-screen Launch control.
- Fixed planning steps that could become blocked despite a valid mission path.
- Fixed owned or ordered vehicles disappearing from proposal and planning routes.
- Fixed backward navigation returning to the wrong step or refusing to move.
- Fixed compatible shared-launch contracts failing to appear.
- Corrected shared-launch compatibility rules and added clearer explanations.
- Fixed stale or missing trajectory previews and severe frame hitches while moving between planning choices.
- Fixed late-delivery totals not updating with schedule choices.
- Reduced unnecessary rebuilding and flashing on order and campaign screens.
- Fixed oversized tooltips, stale overlays, confusing capacity readouts, and redundant result text.
- Expanded automated testing across mission families, shared launches, lunar flights, campaign continuity, and the contract-to-launch flow.
As a solo developer, playtesting every possible mission path is one of the hardest parts of development. If you run into something that is obviously broken, find a planning step confusing, or have an idea for improving the game, please share it in the Steam Discussions. Bug reports and suggestions are more than welcome.
Thank you for playing and supporting Launch Window.
