Terminal Interior Expansion Update
From now on, you can build out the interiors of your terminals!
Right-click on Terminal 3, Terminal 4, or a terminal extension to open a new window showing the terminal’s floor plan.
8 facilities are available:
Shop (1×1, $25,000) — $200/day income
Restaurant (2×1, $40,000) — $400/day income
Check-in Counter (1×1, $15,000)
Security Checkpoint (2×1, $30,000)
Lounge (2×2, $80,000) — $800/day VIP income
Gate / Waiting Area (2×1, $20,000)
Restrooms (1×1, $10,000) — $50/day income
Duty Free (2×1, $60,000) — $600/day income
How it works:
Right-click on Terminal 3, 4, or a terminal extension
Select a facility from the sidebar and place it on the floor plan
Demolish via right-click or the demolish button (50% refund)
Income is credited automatically each day
Terminal income is now displayed separately in the statistics window
All facilities are saved automatically with your game
Terminal 3/4 and Extensions:
Parking positions (small and large) can only be built if a gate has been placed on the corresponding tile inside the terminal.
Terminal 1/2:
These terminals do not have an interior system, so parking positions can still be built without restrictions.
Error message:
If no gate is present, the message “Missing Gate in Terminal” will appear.
Terminal 3/4 readiness:
Aircraft will only be assigned to parking positions if the connected terminal has at least one check-in counter, one security checkpoint, and one gate in the interior layout.
Requirement per parking position:
Each parking position requires one check-in counter, one security checkpoint, and one gate in the interior.
Have fun designing your terminals! ✈️
