Developer postOriginal post (opens in a new tab)

Internal Development Build 0.225.0.58 - Mmm, that new flooring smell.

• D/E/F/G Decks, Ring 0 - Re-modelled all 3 versions of the stairs in the reactor room so that they fit the new deck heights.

• D/E/F/G Decks, Ring 0 - Added new spline-driven railings to the new stairs.

• F/G Decks, Ring 1 - Designed and modelled 4 new rubber floor panels. (They are similar to the old ones, just more detailed)

• F Deck, Ring 2 - Designed and modelled 1 new rubber floor panels.

• F Deck, Rings 1/2 - Added numerous new socket-based connection points around for the new floor panels.

• F Deck, Rings 1/2 - Fleshed out more of the structural framework pieces.